欢迎来到信誉一分彩网投大平台官方网站!
全国咨询热线0531-84277123
您的位置: 首页>> 工程案例 >>常见问答

咨询热线

15628816012

操作电动升降机核心/山东加工定制流水线专用

作者:天麒液压机械 浏览:87 时间:2019-10-18 www.tqsjj.com

信息摘要:

保证电缆线恰当,调节2个电动机的旋转。开关电源的电梯轿厢自动开关的一切正常实际操作下的吊笼上开展人满载调节实际操作自动开关的顶端服务平台,笼左右运作几回在滑轨

操作电动升降机核心/山东加工定制流水线专用

电动升降机:保证电缆线恰当,调节2个电动机的旋转。开关电源的电梯轿厢自动开关的一切正常实际操作下的吊笼上开展人满载调节实际操作自动开关的顶端服务平台,笼左右运作几回在滑轨、吊笼、运作稳定,无颤动,响声,如常见故障,同时进一步检查导向轮齿轮啮合接触情况,正常的工作负荷试运行,经过运算和操作方法,进一步检查电机和减速器的加热条件。 在全部标准一切正常后容许一切正常安裝运作。针对在建工程施工库房液压升降平台货品机械设备的安裝,也应开展超重25%的载荷试验10分鐘,查验吊笼梁的弯曲刚度,并留意导轮精准定位坚固靠谱,发觉难题应立即处理。

Make sure the cable is proper and adjust the rotation of 2 motors. Carry out the top service platform of the automatic switch of the elevator car of the switching power supply under all normal practical operation on the lifting cage. The cage operates several times on the slide rail, lifting cage, stable operation, no vibration and noise, such as common faults. At the same time, further check the engagement and contact of the guide wheel gear, normal working load trial operation, after calculation. And operation method, further check heating conditions of motor and reducer. Allow all normal installation and operation after all standards are normal. For the installation of the mechanical equipment of the goods on the hydraulic lifting platform in the construction warehouse of the project under construction, a 25% overweight load test should also be carried out for 10 minutes to check the bending rigidity of the cage beam, pay attention to the precise positioning of the guide wheel, be firm and reliable, and deal with the problems immediately if found.

仓库升降平台正确操作流程

Correct operation process of warehouse lifting platform

在工程施工库房液压升降平台的货品机械零部件安裝及时时,另外在试运转时要调节不一样位置的相对性部位和限位开关臂长,很多人空隙调节后能够开展吊笼运作实验。

During the installation of the mechanical parts of the hydraulic lifting platform in the construction warehouse, in addition, the relative positions and the length of the limit switch arm at different positions should be adjusted during the test run, and many people can carry out the cage operation experiment after the gap adjustment.

一定要切断主机电源,然后把检查电机与减速机连接罩拆下,插入一个杆单元轴连洞,必须在电机制动器松闸的手同时开放式移动,移动到第二次,像往复移动,蒸约1M。

Be sure to cut off the power supply of the main engine, then remove the connecting cover between the inspection motor and the reducer, insert a shaft connecting hole of the rod unit, and move it to the second time when the brake of the motor is released, such as reciprocating movement, about 1m steam.

另外查验挂篮在滑轨墙上的升降机,调节滚轴部位,使电动吊篮的齿条部位精确,均衡运作,各轮与滑轨架柱管触碰匀称,无撞击。

In addition, check the elevator of the hanging basket on the slide rail wall, adjust the roller position to make the rack position of the electric hanging basket operate accurately and evenly, and each wheel and the column tube of the slide rail frame touch evenly without impact.

然后用手柄把门的把手松开,使笼子慢慢地落下来。上述操作重复一次,机械传动试验在确认操作后进行。

Then release the handle of the door with the handle to make the cage fall down slowly. The above operation is repeated once, and the mechanical transmission test is carried out after confirming the operation.

XML 地图 | Sitemap 地图